3 calibrating the conductivity cell, Calibrating the conductivity cell, Ll (see – Oritron Dionex Ion Chromatography System ICS-2100 User Manual

Page 115: Section 5.1.3

Advertising
background image

5 • Service

Doc. 065291-01 3/09

103

5.1.3

Calibrating the Conductivity Cell

When to Calibrate

After every 6 months of use

NOTE Do not use this procedure to calibrate a new cell. If you

are replacing a cell, see the instructions in

Section 5.10

to install the new cell and calibrate it.

1. Open the ICS-2100 Wellness Panel in Chromeleon (see

Section 5.1.1

), or open the touch screen

ELECTRIC

CONDUCTIVITY

CALIBRATION

page (see

Figure 5-3

).

Items Needed

Description

1.0 mM KCl solution

Prepare by dissolving 0.07456 g of reagent-
grade KCl in 1 liter of 18-megohm DI
water.

Backpressure tubing to provide
at least 7 MPa (1000 psi)

Use 0.076-mm (0.003-in) ID yellow PEEK
tubing (P/N 049715).

Figure 5-3. Electric Conductivity Calibration Page

Advertising