3 . operation and maintenance, 1 operation overview, 3 • operation and maintenance – Oritron Dionex Ion Chromatography System ICS-2100 User Manual

Page 61: Operation overview

Advertising
background image

Doc. 065291-01 3/09

49

3 • Operation and Maintenance

This chapter describes routine operating and maintenance procedures for the ICS-
2100.

The ICS-2100 is designed for IC (ion chromatography) applications and should
not be used for any other purpose. Operation of the ICS-2100 in a manner not
specified by Dionex may result in personal injury.

3.1

Operation Overview

Figure 3-1

illustrates the basic steps for routine operation of the ICS-2100.

Figure 3-1. Operation Flow Chart

Power up the system

Set up the reservoir

(or RFIC-ER system)

Start Chromeleon

Check all

connections

Prime the pump

Set operating

conditions

Equilibrate the

system

Verify operating

status

Process samples

Prepare samples

Advertising