3 removing the epm and reinstalling it, In the new egc holder, Section 5.23.3 – Oritron Dionex Ion Chromatography System ICS-2100 User Manual

Page 202

Advertising
background image

ICS-2100 Ion Chromatography System

190

Doc. 065291-01 3/09

9. Feed the following liquid lines from the bottom of the holder through

the tubing chase to the ICS-2100 front component panel.

TO SRS/AES REGEN OUT

TO INJ VALVE IN - P/ELUENT OUT

TO PUMP/DAMPER

10. Connect the lines to their respective locations:

Connect the line labeled

TO SRS/AES REGEN OUT

to the

REGEN

OUT

port on the suppressor.

Connect the line labeled

TO INJ VALVE IN - P/ELUENT OUT

to

port

P

(

2

)

on the injection valve.

Connect the line labeled

TO PUMP/DAMPER

to the pulse damper.

11. Go on to

Section 5.23.5

.

5.23.3 Removing the EPM and Reinstalling it in the New EGC

Holder

1. Turn the EGC holder upside down to view the connections on the

bottom of the holder.

2. Disconnect the following lines that connect from the EGC degas

assembly inside the EGC holder to the EPM:

Disconnect the line labeled

TO CR-TC ELUENT IN

(red label) from

the coupler that connects it to the line labeled

TO CR-TC/EPM

ELUENT IN

(red label)

.

Disconnect the line labeled

TO CR-TC ELUENT OUT

(yellow label)

from the coupler that connects it to the line labeled

TO CR-

TC/EPM ELUENT OUT

(yellow label).

Disconnect the line labeled

TO CR-TC REGEN OUT

(blue label)

from the coupler that connects it to the line labeled

TO CR-

TC/EPM REGEN OUT

(blue label).

3. Remove the old EGC holder.

Advertising