Oritron Dionex Ion Chromatography System ICS-2100 User Manual

Page 173

Advertising
background image

5 • Service

Doc. 065291-01 3/09

161

Conditioning the EluGen Cartridge

Always condition the EluGen cartridge for 30 minutes before initial use.

1. Make sure the eluent reservoir is filled with ASTM filtered, Type I

(18-megohm) deionized water.

2. Verify that the suppressor and the auxiliary electrolytic device

attached to the

EGC-2

connector (if installed) are off.

3. Verify that the

Automatically turn on with pump

option is not

selected on the ICS-2100 touch screen

SUPPRESSOR

page (see

Section B.9

). Disabling this option lets you turn on the pump, without

automatically turning on the suppressor.

4. From the Control panel in Chromeleon or the touch screen

HOME

page, set the pump flow rate to 1.00 mL/min.

5. Turn on the pump.

6. From the Chromeleon Control panel or the touch screen

ELUENT

GENERATOR

page, set the

EGC-1

concentration to 9 mM.

7. Turn on the EGC-1 current.

8. Run at these settings for 30 minutes.

9. Turn off the EGC-1 current.

10. Turn off the pump.

11. Remove the backpressure coil.

12. Reconnect the

TO INJ VALVE IN - P/ELUENT OUT

line to the mixer

inlet.

To avoid damaging the suppressor (and auxiliary electrolytic device, if
installed), always turn them off before conditioning the EluGen
cartridge. The pump flow is on during conditioning; however, no flow
reaches the suppressor or auxiliary electrolytic device.

Advertising