A.9 injection valve, A.10 auxiliary valve (optional), A.11 vacuum degas assembly – Oritron Dionex Ion Chromatography System ICS-2100 User Manual

Page 214: A.12 column heater, A.13 auxiliary power supply (optional), Injection valve, A.9 injection valve a.10 auxiliary valve, Optional) a.11 vacuum degas assembly

Advertising
background image

ICS-2100 Ion Chromatography System

202

Doc. 065291-01 3/09

A.9

Injection Valve

A.10 Auxiliary Valve

(

Optional)

A.11 Vacuum Degas Assembly

A.12 Column Heater

A.13 Auxiliary Power Supply (Optional)

Injection Valve

6-port, 2-position Rheodyne valve with PEEK wetted components;
electrically-activated

Auxiliary Valve

6-port or 10-port, 2-position Rheodyne valve with PEEK wetted
components; electrically-activated

Channel

Single-channel degas channel with degas membranes

Pump

Dual-stage diaphragm vacuum pump

Materials

Wetted materials, PEEK, Teflon

Operating

Temperature

30 to 60 °C (86 to 140 °F); minimum 5 °C above ambient
temperature. Settable range is equal to working range.

Temperature

Stability

±0.5 °C at sensor

Temperature

Accuracy

±0.5 °C at sensor, at 40 °C

Maximum

Column Lengths

250 mm analytical column with 50 mm guard column

Constant Current

200 mA maximum

Voltage

35 V maximum

Advertising