6 cleaning and replacing the pump check valves, Cleaning and replacing the pump check valves, Rsists, replace the check valve (see – Oritron Dionex Ion Chromatography System ICS-2100 User Manual

Page 130: Section 5.6, Lve (see, Figure 5-13

Advertising
background image

ICS-2100 Ion Chromatography System

118

Doc. 065291-01 3/09

5.6

Cleaning and Replacing the Pump Check Valves

A dirty check valve causes erratic flow rates and pressures. In addition, it
may cause the pump to lose prime and/or be difficult to reprime. If possible,
replace dirty check valves. If new check valves are not available, follow the
instructions for cleaning.

Replacing Check Valves

1. Close the eluent valve from the ICS-2100 Control panel in Chromeleon or

select

Eluent Valve Closed

on the touch screen

PUMP

page.

2. Turn off the main power switch, to ensure that you do not unintentionally start

the ICS-2100.

3. To prevent contamination of pump parts, put on a pair of rubber gloves before

disassembling the pump head.

4. Disconnect the tube fittings from the inlet and outlet check valve assemblies

on the primary pump head (see

Figure 5-13

).

5. Use a 1/2-inch wrench to loosen both check valve assemblies. Remove the

check valve assemblies from the pump head.

NOTE The inlet check valve assembly housing has a 1/4-28 port.

The outlet check valve assembly housing has a 10-32 port.

Figure 5-13. Pump Heads

Secondary

Pump Head

Primary
Pump Head

Outlet Check
Valve

Inlet Check
Valve

Acorn Nuts

Advertising