Ry head (see, Figure 2-16, 2 • features – Oritron Dionex Ion Chromatography System ICS-2100 User Manual

Page 47

Advertising
background image

2 • Features

Doc. 065291-01 3/09

35

Secondary Pump Head

The secondary pump head delivers eluent to the remainder of the
chromatography system (the injection valve, column, and detector). The
waste valve is located on the front of the secondary pump head (see

Figure 2-16

).

To open the waste valve, turn the knob one-quarter to one-half turn
counterclockwise. When the waste valve is in the open position, all pump
flow is directed to waste.

NOTE The waste valve must be open when the pump is

being primed using the Prime button. For detailed
priming instructions, see

Section 5.16

.

Figure 2-16. ICS-2100 Pump Components

Secondary

Pump Head

Primary
Pump Head

Outlet Check
Valve

Inlet Check
Valve

Priming
Valve

Waste Valve

Pressure

Transducer

Advertising