12 maintenance – Oritron Dionex Ion Chromatography System ICS-2100 User Manual

Page 80

Advertising
background image

ICS-2100 Ion Chromatography System

68

Doc. 065291-01 3/09

c.

Click Next > and select the in a new sequence via Sequence
Wizard
option.

d. Click Next > to go to the Sequence Wizard.

e.

Complete the steps in the Sequence Wizard, adding the desired
number of samples and standards to the list. For help, click the
Help button on the Sequence Wizard page.

After you click Finish, a sequence is created and a program
appropriate for the selected application is copied to the sequence. If
you are using Chromeleon, a quantification method is also copied to
the sequence

.

5. Load the sequence and start batch processing:

a.

On the Sequence Control panel, click Load Sequence.

b. Select the sequence created in

Step 4

and click Open.

c.

Click Start Batch.

3.12 Maintenance

This section describes routine maintenance procedures that users may perform.
All other maintenance procedures must be performed by Dionex personnel.

As Needed

Regularly check the eluent reservoir and refill when needed.

Daily

Check the ICS-2100 component panel (see

Figure 2-8

) for leaks or spills.

Wipe up spills. Isolate and repair leaks (see

Section 4.3

). Rinse off any dried

eluent with deionized water.

Check the waste container daily and empty when needed.

Weekly

Once a week, check fluid lines for crimping or discoloration. Replace any
pinched lines. Replace damaged lines.

Check the junctions between the pump heads and the pump casting for
evidence of liquid leaks. If the piston seal wash tubing is not connected, check
the drain tubes at the rear of the pump heads for evidence of moisture. Normal

Advertising