Technical data, Cooling – Xylem IM167 R8 Aquavar CPC (Centrifugal Pump Control) User Manual

Page 138

Advertising
background image

138

Cooling

(Frames R7-R8)

Installation Procedure
Choose the mounting orientation (a, b, c or d).

Required Free Space Around the Unit for

Frame Mounting

Mounting, Maintenance, Service and Cooling*

Size Orientation

Front

Side

Above

mm in mm in mm in

a,d

500

20

200

7.9

R7

b

500

20

200

7.9

c

200**

7.9**

lifting lifting

space space

a,d

600

24

300

12

R8

b

600

24

300

12

c

300**

12**

lifting lifting

space space

* Space for the installer not included.

** Space for the fan and capacitor replacement not included.

Mounting orientations a and b
Make holes in the wall (recommended):

1. Lift the unit against the wall into the mounting place.
2. Mark the locations for the two fixing points in the wall.
3. Mark the bottom edges of the unit to the floor.

a)

b)

c)

Lifted from above

Symbols:

required free space

air inlet surface
wall fixing point (recommended)
control panel mounting slot

TECHNICAL DATA

Advertising