8 loading and starting the plc program, Loading and starting the plc program ( 79), Control technology | ethercat communication manual – Lenze EtherCAT control technology User Manual

Page 79

Advertising
background image

DMS 3.1 EN 01/2011 TD17

L

79

Control technology | EtherCAT communication manual

Commissioning of the system

Detailed commissioning steps

7.2.8.7

Loading the master configuration onto the EtherCAT master
The Reset (original) command serves to load the master configuration

(ECAT_MASTER_1.XML) onto the EtherCAT master:

1. Reset (original) re-initialises the EtherCAT master stack.
2. The master compares the EtherCAT configuration with the physical bus topology. If the

EtherCAT configuration is identical with the bus topology, the bus enters the Pre-

Operational state.

3. Now it is possible communicate with the slaves via the EtherCAT fieldbus.

Checking with »WebConfig« or »Engineer«

 Under Master Configuration, you can check whether the configuration file

ECAT_MASTER_1.XML matches the physical bus structure.

 Depending on the slot used for the EtherCAT (MC-ETC) communication card, the

parameters of the following codes should be checked:
– MC-ETC in slot 1: codes 1080.2 / 1080.3 / 1080.4
– MC-ETC in slot 2: codes 1580.2 / 1580.3 / 1580.4

 If the ECAT_MASTER_1.XML configuration file corresponds to the physical bus

structure, the checksums of "ECAT Master Config" and "ECAT Stack Master" are identical

and the "ECAT Bus Scan Match" parameter has the value 1.

7.2.8.8

Loading and starting the PLC program

 Select the OnlineDownload menu command to load the PLC program included in the

configuration onto the control system.

 Select the OnlineRun menu command to start the PLC program.

Advertising