Control technology | ethercat communication manual – Lenze EtherCAT control technology User Manual

Page 89

Advertising
background image

DMS 3.1 EN 01/2011 TD17

L

89

Control technology | EtherCAT communication manual

Commissioning of the system

Typical commissioning scenarios

7.4.4

Stopping and starting the PLC while the configuration remains unchanged

Initial situation:

 PLC and EtherCAT are running.

– PLC state: Running
– EtherCAT state: Operational

How to stop and start the PLC:

1. Stop the PLC.
2. Start the PLC.
3. The PLC application must call the "SMC_ResetAxisGroup" program organisation

unit.

4. The system is running again.

Legend
PLC:

EtherCAT:

Transient state of PLC and EtherCAT

Automatic change to next state

Load PLC

Load PLC application

PLC:

EtherCAT:

Steady state of PLC and EtherCAT

Change to next by means of an external

action

Start PLC

Start PLC application

Reset

(origin)

Reset the PLC.

The PLC application is deleted.

Start

Beginning of the scenario

Start

Stop PLC

PLC:

Running

EtherCAT:

Operational

Call

<SMC_ResetAxisGroup>

POU

from PLC application

PLC:

Stop

EtherCAT: Pre-Operational

PLC:

Running

EtherCAT: Safe-Operational

Start PLC

System is running

Advertising