Loading link contents or fieldbus device, Loading link contents or fieldbus device -57 – Rockwell Automation PLC-5 Fieldbus Solutions for Integrated Architecture User Manual User Manual

Page 143

Advertising
background image

Publication 1757-UM006A-EN-P - May 2002

Configurating the 1757-FIM 4-57

6. After the load completes, click the Monitoring tab.

The Monitoring tab opens.

7. Verify that the FIM icon appears in Monitoring tab.

8. Click the

to expand the FIM.

9. Verify that the LINK icons appear under the FIM.

Loading Link contents or fieldbus device

Use the following procedure to load the Fieldbus link contents or
fieldbus devices. It assumes that the FIM has been loaded and the
fieldbus devices are installed and powered on the Links.

1. In Project tab, click the desired LINK icon.

Advertising