Bio-Rad BioLogic Signal Import Module (SIM) User Manual

Page 59

Advertising
background image

2.

Insert the rods into the holes at each corner of a tray. Insert the rods from underneath the tray such
that they produce a firm fit in the holes.

3.

For a 2 or 3-tray rack, attach sleeves to the middle of all four long vertical bars. Remember that the
sleeves should be oriented so that the wide part of the taper is nearest the rod’s bottom end.

Figure 2-26. Rack Assembly

4.

For a 2 or 3-tray rack, place the second tray on top of the four sleeves and press firmly to seat the
tray. Repeat these instructions to add the upper tray.

5.

Mount the 2-piece column clamping arrangement across the two long rods using the attached
thumbscrews.

6.

Two horizontal bars with rod clamps and an Allen wrench are provided with the system. These are
used to hold devices, such as valves. Position them between any of the upright bars.

7.

Remove the four green caps covering the holes at the four corners on top of the Workstation. Place
the rack into the four corner holes.

TRAY

COLUMN
CLAMPING
ARRANGEMENT

TAPERED
COLLAR

DESCRIPTION OF SYSTEM COMPONENTS

SYSTEM OVERVIEW

2-46

Advertising