Bio-Rad BioLogic Signal Import Module (SIM) User Manual

Page 98

Advertising
background image

6.

Plumbing the AVR7-3 Inject Valve.
a. The inject port assembly and needle are included with each AVR7-3 inject valve. Screw this

assembly into port 2 of the valve until it is secure.

b. Connect the sample loop to ports 3 and 6.
c. Plumb the inject valve according to Figure 4-6. Use the tubes labeled "waste" or make fittings

using 1/16” (1.6 mm) OD Tefzel tubing and 1/4-28 fittings for waste lines 1 and 7.

d. Use the tube labeled #3 or make a fitting using 1/16" (1.6 mm) OD Tefzel tubing and 1/4-28

fitting to go from port 4 to the column.

Figure 4-6. Inject Valve Plumbing for an AVR7-3

7.

Plumbing the UV Detector and Conductivity Monitor.
a. Connect a piece of 1/16” (1.6 mm) OD orange PEEK tubing (tube #4 in the tubing kit) between

the column outlet and the bottom inlet of the UV detector flow cell using 1/4-28 fittings. If you
are using the QuadTec detector, connect it to the flow cell which is bidirectional, using 10-32
fittings provided with the QuadTec.

b. Use the tube labeled #5 in the tubing kit or cCut approximately 8 cm of 1/16” (1.6 mm) OD

orange PEEK tubing and attach 1/4-28 fittings. Connect one end into the top of the UV detector
flow cell. Connect the other end into the Conductivity monitor flow cell which is bi-directional. If
you are using a QuadTec detector, connect tubing from its flow cell outlet using a 10-32 fitting to
either port of the Conductivity monitor using 1/4-28 fittings.

c. Place the Conductivity flow cell into the notch of the optics bench. This is a gentle push-fit.

There is a tag (with a number) attached to the conductivity cable. This number is the flow cell
constant and must be entered in the software before beginning a run. Refer to Table 5-6, page
5-10 Utilities drop-down Menu: Conductivity Flow Cell Constant Calibration.

d. For flow rates below 10 ml/min, insert the 40 psi backpressure regulator after the conductivity

monitor. Plumb the backpressure regulator following the direction of the arrow.

COLUMN

WORKSTATION
PUMP

SAMPLE
LOOP

SAMPLE

INJECT

WASTE

WASTE

6

7

1

2

3

4

5

LOAD

COLUMN

WORKSTATION
PUMP

SAMPLE
LOOP

SAMPLE

INJECT

WASTE

WASTE

6

7

1

2

3

4

5

INJECT

COLUMN

WORKSTATION
PUMP

SAMPLE
LOOP

SAMPLE

INJECT

WASTE

WASTE

6

7

1

2

3

4

5

PURGE

SYSTEM PLUMBING

SYSTEM INSTALLATION AND SETUP

4-6

Advertising