Installation, 1 unpacking & repacking, Installation -1 – Boonton 4500B Peak Power Meter User Manual

Page 29: 1 unpacking & repacking -1

Advertising
background image

Boonton 4500B RF Peak Power Analyzer

Installation

2-1

2. Installation


This section contains unpacking and repacking instructions, power requirements, connection descriptions and
preliminary checkout procedures.

2.1 Unpacking & Repacking

The Model 4500B is shipped complete and is ready to use upon receipt. Figure 2-1 shows you the various
pieces included in the packaging and the order in which they are loaded into the container. Actual details may
vary from the illustration.

Note

Save the packing material and container to ship the instrument, if necessary. If the original
materials (or suitable substitute) are not available, contact Boonton Electronics to purchase
replacements. Store materials in a dry environment. Refer to the Physical and
Environmental Specifications in Table 1-2. for further information.

Figure 2-1. Packaging Diagram








Advertising