Generating bestfit coefficients, Selecting the bestfit parameters – ADS Environmental Services Profile Software 950015B6 User Manual

Page 243

Advertising
background image

Quantity Coefficient Generator

4-21

CONFIDENTIAL – Covered by ADS Software License Agreement

1998 - 2012 ADS LLC. All Rights Reserved.

Generating Bestfit Coefficients

When the average coefficient values (HC, Roughness, or Slope) do
not accurately reflect the true coefficients for the monitoring point,
you can generate a bestfit coefficient which minimizes the
mathematical error through the span of the coefficients.

Note: You must have at least five field confirmations at
varying depths to use this option.

Performing the following steps ensures the successful generation of
a Bestfit HC or Bestfit Roughness and Slope coefficients:

• Selecting the bestfit parameters

• Generating a Bestfit HC

• Generating a Bestfit Roughness and Slope

Selecting the Bestfit Parameters

Curve
Properties
button

Select the Curve Properties toolbar button to access the Setup tab.
Verify and update any fields on the Setup tab that may require new
information prior to generating Bestfit coefficients.

Advertising