Creating a second monitoring point, Assigning a rain gauge to a monitoring point, Creating a second monitoring point -24 – ADS Environmental Services Profile Software 950015B6 User Manual

Page 64

Advertising
background image

2-24

Profile Software User's Guide

CONFIDENTIAL – Covered by ADS Software License Agreement

1998 – 2012 ADS LLC. All Rights Reserved.

The new monitor location with a single monitoring point is now
created, configured, and available in the database.

Creating a Second Monitoring Point

Use this option only when you want to create a second monitoring
point for an ADS monitor location. The first monitoring point is
created automatically when a monitor location is created.

Create a second monitoring point in the Profile database for the
currently selected monitor by selecting Edit > New > Monitoring
Point
or the New Monitoring Point toolbar button.

1. Select a location from the database.

New
Monitoring
Point
button

2. Select the Edit > New > Monitoring Point option or the New

Monitoring Point toolbar button. This option is only available
when a monitor location is selected.

A second monitoring point now exists for the selected monitor
location.

Assigning a Rain Gauge to a Monitoring Point

Allow Profile to report the corresponding rain data for a monitoring
point by assigning a rain gauge. Perform the following steps to
assign a rain gauge to a monitoring point:

1. Select the monitoring point from the database to which you

want to assign a rain gauge.

Properties
button

2. Select the Edit > Properties option or the Properties toolbar

button.

3.

Complete the Properties for [location name, monitoring
point
] dialog in the following way:

Advertising