ADS Environmental Services Profile Software 950015B6 User Manual

Page 333

Advertising
background image

6-62

Profile Software User's Guide

CONFIDENTIAL – Covered by ADS Software License Agreement

1998 - 2012 ADS LLC. All Rights Reserved.

All Sensors Scrubbed Select this checkbox if the field

crew scrubbed the sensors at the monitoring point during the
field confirmations.

Pressure Offset Consistent Select this checkbox if the

calculated pressure sensor offset remains consistent with the
existing offset.

Gas Test Positive Select this checkbox if the field crew

registered the presence of hazardous gases beyond the
acceptable limits.

Confirmation Taken Select this checkbox if the field crew

performed confirmations during the confirmation visit.

Debris On Ultrasonic Select this checkbox if the field

crew discovered debris on the ultrasonic depth sensor during
the site visit.

Water in Pressure Hose Select this checkbox if moisture

was detected in the hose extending from the pressure depth
sensor to the monitor.

Evidence Of Surcharge Select this checkbox if

indications exist that a surcharge occurred since the last visit
to the monitor location.

Groundwater Gauge Checked Select this checkbox if

the field crew inspected the groundwater gauge.

Debris On Velocity Select this checkbox if the field crew

discovered debris on the velocity sensor during the site visit.

Velocity Test Confidence Select the best option that

describes the confidence you have in the manual velocity
measurement obtained using the portable velocity meter.

Evidence Of Overflow Select this checkbox if the field

crew discovered evidence that an overflow occurred at the
monitor location since the last site visit.

Overflow Active Select this checkbox if overflow

conditions exist at the monitor location during the site visit.

Advertising