Figure 77 "mmi local – Nortel Networks 1000 User Manual

Page 306

Advertising
background image

306

NT5D33 and NT5D34 Lineside E1 Interface cards

Figure 77
MMI Local loopback test

Test 2, external loopback, applies an external loopback to the E1 link. Test
data is generated and received by the LEI on all timeslots. If test 1 passes
but test 2 fails, it indicates that the E1 link is defective between the LEI and
the external loopback location. If test 1 was not run and test 2 fails, the
E1 link or the LEI could be defective. To isolate the failure to the E1 link,
tests 1 and 2 must be run in tandem.

Figure 78 "MMI External loopback

test" (page 306)

demonstrates how an external loopback is applied to the

E1 link.

Figure 78
MMI External loopback test

Test 3, network loopback, loops the LEI’s received E1 data back toward
the CPE. No test data is generated or received by the LEI. If test 2 passes
but test 3 fails, it indicates that the CPE device is defective. If test 2 was
not run and test 3 fails, the E1 link or the CPE device could be defective.
To isolate the failure to the CPE device, tests 2 and 3 must be run in
tandem.

Figure 79 "MMI Network loopback test" (page 307)

illustrates how

the signaling is looped back toward the CPE.

Nortel Communication Server 1000

Circuit Card Reference

NN43001-311

02.06

Standard

27 August 2008

Copyright © 2003-2008 Nortel Networks

.

Advertising