Start–Up and Adjustment

Publication 1397-5.0 — June, 2001

Pre-Power Verification

!

ATTENTION: Prior to energizing the Drive, it is
imperative that the installation instructions in Chapter 2
and the Pre-Power checks listed in the previous section
be completely accomplished. No attempt to apply
power should be made if the installation is in question.
Failure to properly install and configure the Drive or
options could result in personal injury and/or
equipment damage.

Additionally, you must verify that all Drive options are properly
configured for their intended application. These options include, but
are not limited to:

OPTION

INSTALLATION MANUAL

• Enhanced Field Supply

1397 – 5.24

• Regulated Field Supply

1397 – 5.17

• 60 HP AC Line Disconnect

1397 – 5.11

• Dynamic Braking

1397 – 5.14

• Pulse Encoder Interface

1397 – 5.13

• Expansion I/O

1397 – 5.19

• AC Tach Interface

1397 – 5.22

• 460/230V Fuse Kit

1397 – 5.16

• Blower Motor Starter

1397 – 5.20

• 150 HP AC Line Disconnect

1397 – 5.21

• 115VAC Control Int Bd

1397 – 5.18

• Inverting Fault C.B. Kit

1397 – 5.29

• AC Line Disconnect Kit

1397 – 5.30

• AC Line Filter Kit

1397 – 5.31

Ensure that the Coast/Stop input between terminals TB-7 and TB-8
of the Regulator Board is locked in the open state.

If the Drive is equipped with an optional AC disconnect, verify that
the disconnect is in the open position.

Record the motor field polarity in Table 4.B, as terminated at
terminals F1 and F2 of the field terminal strip (Figures 4.7 & 4.8).