Metrohm 751 GPD Titrino User Manual

Page 33

Advertising
background image

2.6. Parameters, key <PARAM>

751 GPD Titrino

30

Titration sequence of SET

After the start, the activate pulse is outputted and the stir-
rer switched on.

The start delay time is waited off.

If conditioning is on, the sample solution is titrated until
the (first) EP is reached. The display shows then

drift OK 2.3 ul/min

or

SET pH conditioning

The vessel is now conditioned. The titration can be started
with <START>.

The sample identifications and the sample size are re-
quested.

The temperature is measured if a T sensor is connected.

Pause 1 is waited off, the start volume is dispensed and
pause 2 waited off.

The titration to EP1 then to EP2 is executed. If the extrac-
tion time is not yet over when EP1 has been reached, the
titration will only be terminated after the extraction time is
over.

The stirrer is switched off when there is no conditioning.

Calculations are carried out.

Data are outputted.

Conditioning is carried out.

(Activate pulse)

(Stirrer ON)

<START>

(Start delay)

(Start conditions)

(Request ident.)

(Request smpl size)

(Extraction time)

Titration with test of

stop criterion

Calculations

Data output

(Reconditioning)

(Preconditioning)

(<START>

(Activate pulse)

(Start delay)

(Stirrer OFF)

Advertising