Metrohm 751 GPD Titrino User Manual

Page 90

Advertising
background image

2.12 TIP, Titration procedure

751 GPD Titrino

87

Sequence of TIP
As there is no preset sequence of TIP, in what follows the procedure is illustrated by a
sequence that contains all available commands.

The start delay time is waited off.

The sample identifications and the sample size
are requested.

Stirrer is switched on. The stirrer is not operated
automatically in submethods of TIP. At the end of
TIP, however, the stirrer is switched off (with stir-
rer control ON).

Submethods are processed according to their
parameters. They run to completion, including
calculations and data output (e.g. curves). The
determination data of submethods are overwrit-
ten in the next sequence step of TIP. Those val-
ues which are needed for higher-level calcula-
tions must therefore be assigned to temporary
variables C7X.

The pause is waited off.

Outputs on the socket "Remote" can be set.

A message can be written in the display. The se-
quence is held until it is continued manually (with
<START>, <QUIT> or <ENTER>).

The titration burets can be prepared.

TIP higher-level calculations are carried out.

Data output in TIP (TIP contains no more deter-
mination data, i.e. curves must be put out within
the submethods).

<START>

(Start delay)

(Request ident.)

(Request smpl size)

Submethod

Calculations

Data output

Switching ON stirrer

Set output

TIP calculations

Pause

Info

C7X

TIP data output

Prep

Advertising