Toca-2 – Yokogawa Integral Oxygen Analyzer ZR202 User Manual

Page 10

Advertising
background image

TocA-2

IM 11M12A01-02E

2.7.9

Case Assembly for Calibration Gas Cylinder (E7044KF) ................2-27

2.7.10 ZR22A Heater Assembly..................................................................2-27

3.

Installation ................................................................................................. 3-1

3.1

Installation of General-purpose Detector .......................................................3-1
3.1.1

Installation Location ...........................................................................3-1

3.1.2

Probe Insertion Hole ..........................................................................3-1

3.1.3

Installation of the Detector .................................................................3-2

3.1.4

Installation of the Dust Filter (K9471UA), Dust Guard Protector

(K9471UC), Probe Protector ZO21R .................................................3-2

3.2

Installation of High Temperature Detector

(ZR22G-015) .......................................................................................................3-5
3.2.1

Installation Location ...........................................................................3-5

3.2.2

Usage of the High Temperature Probe Adapter (ZO21P-H) ..............3-5

3.2.3

Probe Insertion Hole ..........................................................................3-6

3.2.4

Mounting of the High Temperature Detector ......................................3-6

3.3

Installation of the ZR402G Converter .............................................................3-8
3.3.1

Installation Location ...........................................................................3-8

3.3.2

Mounting of the Converter .................................................................3-8

3.4

Installation of ZA8F Flow Setting Unit ..........................................................3-10
3.4.1

Installation Location .........................................................................3-10

3.4.2

Mounting of ZA8F Flow Setting Unit ................................................3-10

3.5

Installation of ZR40H Automatic Calibration Unit ....................................... 3-11
3.5.1

Installation Location ......................................................................... 3-11

3.5.2

Mounting of ZR40H Automatic Calibration Unit ............................... 3-11

3.6

Installation of the Case Assembly(E7044KF) ..............................................3-13
3.6.1

Installation Location .........................................................................3-13

3.6.2

Mounting ..........................................................................................3-13

3.7

Insulation Resistance Test .............................................................................3-14

4.

Piping ......................................................................................................... 4-1

4.1

Piping for System 1 ...........................................................................................4-1
4.1.1

Parts Required for Piping in System 1 ...............................................4-2

4.1.2

Connection to the Calibration Gas Inlet .............................................4-3

4.1.3

Connection to the Reference Gas Inlet .............................................4-3

4.1.4

Piping to the High Temperature Probe Adapter .................................4-3

4.2

Piping for System 2 ...........................................................................................4-5
4.2.1

Piping Parts for System 2 ..................................................................4-6

4.2.2

Piping for the Calibration Gas ............................................................4-6

4.2.3

Piping for the Reference Gas.............................................................4-7

4.2.4

Piping to the High Temperature Probe Adapter .................................4-7

4.3

Piping for System 3 ...........................................................................................4-8
4.3.1

Blow Back Piping ...............................................................................4-9

8th Edition : Jan.13,2012-00

Advertising
This manual is related to the following products: