Yokogawa Integral Oxygen Analyzer ZR202 User Manual

Page 170

Advertising
background image

<11. Inspection and Maintenance>

11-10

IM 11M12A01-02E

11.3 Replacing Flowmeter in ZR40H Automatic

Calibration Unit

(1) Remove piping and wiring, and remove the ZR40H from the 2B pipe or wall mounting.
(2) Remove four M6 bolts between brackets.
(3) Remove piping extension
(4) Remove bolts holding flowmeter, and replace it. A white back plate (to make the float easy

to see) is attached. The end of the pin holding down the back plate must be on the bracket

side.

(5) Replace piping, and fix M6 bolts between brackets. *1

*1 : When disassembling and reassembling, mark original positions, and tighten an extra 5-10° when reassembling.

After tightening, do a liquid leakage test.

COM ON S N

Z RO

F11.8E.ai

Bolt fixes bracket

Flowmeter with back plate

Connecter

Fig. 11.8 Flowmeter replacement

F11.9E.ai

A

A'

B

B'

C

C'

D

D'

Two screws fix flowmeter

Connect piping pairs A-A', B-B', C-C', D-D'

Fig. 11.9 Fixing Flowmeter

8th Edition : Jan.13,2012-00

Advertising
This manual is related to the following products: