<5. Wiring>

5-11

IM 11M12A01-02E

8th Edition : Jan.13,2012-00

5.7

Wiring for ZR40H Automatic Calibration Unit

This wiring is for operating the solenoid valve for the zero gas and the span gas in the ZR40H

Automatic Calibration Unit, in a system where the calibration gas flow rate is automatically

controlled (e.g. System configuration 3). When installing this wiring, proceed as follows:

COMMON SPAN

ZERO

to ZR402G terminal "AC-COM"

to ZR402G terminal "AC-SPAN"

to ZR402G terminal "AC-ZERO"

Wiring inlet
2-G1/2, Pg13.5, M20 or 1/2NPT

ZERO

SPAN

COMMON

Span gas solenoid valve

Zero gas solenoid valve

Terminal screw : M4

F5-12E.ai

Figure 5.11 Automatic Calibration Unit

5.7.1

Cable Specifications

Use a 3-core cable for the above wiring.

5.7.2

Wiring Procedure

M4 screws are used for the terminals of the converter. Each cable should be terminated

corresponding to crimp-on terminals. M4 screws are used for the terminals of the solenoid valve

as well.

ZR402G

Converter

ZR40H Automatic

Calibration Unit

AC-Z

AC-C

AC-S

Zero

Span

F5-13.ai

Figure 5.12 Wiring for Automatic Calibration Unit