Road, Preparing for the example, continued – Leica Geosystems TPS1100 Professional Series - Reference Manual User Manual

Page 212

Advertising
background image

212

TPS1100 - Appl. Prog. Ref. Manual 2.2.0en

Road+

Preparing for the example, continued

RPLUS08

N

3

0

3

6

9 m

0+00

E: 314.15
N: 308.05
H: 30.50

0+6.10

PC CHA=0+7.62

E: 320.007
N: 322.885

Road Centerline

0+18.30

0+24.4

Edge of Road

E: 305.00
N: 305.00
H: 31.10

PT CHA=0+20.298

Setup Point

Approx. Line of Catch Points

R = 9.080

E: 305.000
N: 320.240

PI
CHA=0+15.240
I=80°00'00"
T=7.620
R=9.087
L=12.680
C=11.674
E=2.774
M=2.125

T = 7.62

80°00'00"
(88.889 gon)

L = 12.680

C = 11.674

T = 7.62

E = 2.774

M = 2.125

RPLUS09

2.000%

EOP
CHA=0+27.918
EOP EL=31.654

BOP CHA=0+00

BOP EL=31.10

Road Profile
at 2.00%

Original Ground Elevation 30.500

Advertising