Stakeout – Leica Geosystems TPS1100 Professional Series - Reference Manual User Manual

Page 46

Advertising
background image

46

TPS1100 - Appl. Prog. Ref. Manual 2.2.0en

Stakeout

Hz Angle 2
Angle from the second auxiliary point
to the stakeout point.

Dist 2
Distance from the second auxiliary
point to the stakeout point.

∆∆∆∆∆

Height

Difference in height between the last
measured reflector point and the
stakeout point. Positive in sign if
stakeout point is higher than the
reflector position.

Simultaneously measure and
record data in the

measurement job

Measure a distance.

Record the measurement in
the measurement job.

Acquire the next point to
stake.

Enter target data.

Re-position the telescope on
the target. Note, this function

is only available for motorized
theodolites.

Change stakeout
method.

For more information refer to chapter
"Select Stakeout Method".

Generate a plot of the
stakeout data. For

more information refer to chapter
"Plot".

Exit the program.

Stakeout with auxiliary points, continued

Point Id
Point Id of the point to be staked.

Refl. Ht
Reflector height used at target point

Hz Angle 1
Angle from the first auxiliary point to
the stakeout point.

Dist 1
Distance from the first auxiliary point
to the stakeout point.

STAKE\ Auxiliary points

Point Id

:

12

Refl. Ht. :

1.65 m

Hz angle 1 :*

----- m

Dist 1

:

----- m

Hz angle 2 :*

----- m

Dist 2

:

----- m

ALL

DIST

REC

CONT

POSIT

MC

METHD

I<>II QUIT

∆∆∆∆∆

Height

:

----- m

Advertising