3 maintenance system – HEIDENHAIN CNC Pilot 4290 User Manual

Page 419

Advertising
background image

HEIDENHAIN CNC PILOT 4290

407

Selecting the list
You can open the list ”Maintenance and Repair
Tasks” according to the following criteria:

List of all maintenance tasks

List of the ”pending, current and

overdue maintenance tasks”

Switch the soft-key row to ”Type/

Status of Tasks”

Type of tasks:

List of repair tasks

List of maintenance tasks

List of inspection tasks

List of cleaning tasks

Status of the tasks:

List of the ”current and overdue

maintenance tasks”

List of the ”pending maintenance

tasks”

Acknowledged measures

Lists the acknowledged maintenance

measures

List of acknowledged measures:

Type:

Symbol: See ”Type of maintenance actions” table

”+”: Measure was acknowledged

Measure: Designation of the maintenance action

Acknowledged – through: Name of the
acknowledger
Acknowledgment – on: Date of the
acknowledgment

At: Time of ”maintenance action is due” (t2)

Comment of the acknowledger

Time data (German / English)

M / M:

Minutes

S / H:

Hours

T / D:

Days

W / W:

Weeks

J / Y:

Years

Parts of a time unit are given as decimal numbers. Example: 1.5 S = 1
hour and 30 minutes.

9.3 Maintenance System

Advertising