2 editing the protocol for a single run, Editing the protocol for a single run, Editing the protocol for a – Leica Biosystems PELORIS_PELORIS II User Manual

Page 53: Single run)

Advertising
background image

Running Protocols

Leica PELORIS™ User Manual Rev K © Leica Biosystems Melbourne Pty Ltd 2011

53

3.4.2 Editing the Protocol for a Single Run

You can edit the protocol for an individual run just before the run is started. You can make two

types of change:

1. Skip the first steps of the protocol
2. Change step durations

Make both types of change in the Edit protocol instance dialog box opened from the

Scheduling dialog box. Start a protocol run as normal from the Status screen and continue until

the Scheduling dialog box opens. Tap the Edit steps button to open the Edit protocol instance

dialog box.

Figure 33. Edit protocol instance dialog box

To skip protocol steps tap the step that you want to start the run with. Steps prior to this are

unchecked to show they will not run.
The reagent selected as the new first step will be used for an initial fill if required (see 3.6.1

Delayed End Times and Initial Fills).

To change a step time tap the current step time. Set a new time in the Duration dialog box.

Skipping steps and changing step durations will affect protocol scheduling – confirm that the new

Predicted end time shown in the Scheduling dialog box is acceptable before you start the run.

No check in the circle shows

this step will be skipped

Tap the step that will be the

first to run in the protocol

Tap on a step time to open

the Duration dialog box to

set a new step duration

Advertising