Metrohm 746 VA Trace Analyzer User Manual

Page 421

Advertising
background image

5.7 Program instructions

746 VA Trace Analyzer / 747 VA Stand

5-270

Description

The

RAMP

instruction starts the voltage ramp defined in the parameters.

U

t

U.start

U.end

U.step

t.step

Comments

•

The electrode type must be defined before the

RAMP

instruction.

Admissible are

HMDE

or

RDE

.

•

The measurement mode must be defined before the

RAMP

instruc-

tion. Admissible is only

CYCMODE

.

•

The

RAMP

instruction must always be located within a CSWEEP

block. Maximum 5

RAMP

instructions are allowed.

•

Apart from the

RAMP

instructions, no other SWEEP instruction is

allowed in the same segment.

•

If the final voltage

U.end

should not be switched off at the end of the

program, enter a suitable standby voltage

U.standby

in a

ØMEAS

instruction.

•

Within a CSWEEP block a wait time between two ramps can be
programmed only by insertion of an additional, slow ramp as flat as
possible.

Examples

Cyclic voltammetry of Pb and Cd at the HMDE:

Method: cv SEGMENT

CdPb

================================================================================

Instructions t/s Main parameters Auxiliary parameters

––––––––––––– ––––– ––––––––––––––––––––––––– –––––––––––––––––––––––––

1 HMDE Drop size 2 Meas.cell normal

2 CYCMODE I.range 1.4 uA Prep.cycles 2

Meas.cycles 5

3 (CSWEEP

4 RAMP U.start -100 mV U.step 10 mV

U.end -900 mV t.step 0.10 s

Sweep rate 100 mV/s

5 RAMP U.start -900 mV U.step 10 mV

U.end -100 mV t.step 0.10 s

Sweep rate 100 mV/s

6 CSWEEP)

7 END

.

see also

CYCMODE, (CSWEEP, CSWEEP), HMDE, RDE

Advertising