Chapter 9

Connecting the I/O Link

9-10

Figure 9.10 shows I/O link connections to PanelView Operator terminal
(2711 series) both as a middle device and as an end device on a link.
Terminal 1 connected internally for line 1 (blue-insulation conductor). The
middle terminal is connected internally for the shield. Terminal 3 is
connected internally for line 2 ( clear-insulated conductor). At each
PanelView Operator terminal, connect the shield drain wire of each cable
segment to give the shield continuity. However, never ground the shield at
a PanelView Operator terminal. At a PanelView Operator terminal
connected as an end device on a link, connect a 150-Ohm 1/4-Watt
termination resistor across the signal lines.

Figure 9.10

Connections to PanelView Operator Terminal

150

Blue

Shield

Clear

Blue

Shield

Clear

Blue

Shield

Clear

16614

PanelView

Operator

terminal

PanelView

Operator

terminal

To

Scanner

1

2 sh

1

2 sh

ATTENTION: Do not disconnect the connector on a middle
device when the system is operating because that would cause
discontinuity in the link and remove the termination. The
connection between terminals is inside the module.

After you have finished connecting the I/O link cabling, proceed to
chapter 10 to provide power to the I/O sub-system.