Chapter 1

Preparing for Installation

1-2

Using the list of hardware supplied by your system designer, make sure all
the listed hardware is available.

Check the invoice to make sure that the catalog numbers on the boxes
match the hardware that’s on your hardware list.

If the hardware is:

Then:

not available

check with your system designer to see if something has changed.

available

continue to the next section.

Some of the PI modules are packaged in bags to help protect them from
electrostatic damage. When you see this bag, provide a static-safe
environment when:

taking the module out of the bag
setting jumpers inside the module
placing the side panel on the module

As a minimum, we recommend the 3M Type 8005 Portable Field Service
Grounding Kit or its equivalent for providing a static safe environment.

ATTENTION: If you perform operations on a module
improperly, you may cause an electrostatic discharge, which can
damage the module. Perform internal operations, such as setting
the jumpers, only in a static safe environment.

For further information, see the application data, Guarding Against ESD
Application Note
(ICCG-4.3).

Hardware Availability

Unpack the Hardware

Advertising