2 time(date), Time(date) – Metrohm tiamo 2.4 (process analysis) User Manual

Page 93

Advertising
background image

■■■■■■■■■■■■■■■■■■■■■■

2 General program functions

tiamo 2.4 (for Process Analysis)

■■■■■■■■

77

NOTE

UTC = Universal Time , from which the times in the various time zones
of the earth are derived. CET (Central European Time) is equal to UTC
plus 1 hour, in the summer time UTC plus 2 hours.

2.4.4.6.2

Time(Date)

Dialog window: Formula editor

Operators/Functions

Syntax
y = Time(year; month; day)

Gives the entered figures in the format Date/Time.

Parameters

year

00…99 or 1000…9999

month 1…12

day

1…31

A parameter can be indicated either directly as a number or as a variable
of the type Number. If the parameter does not correspond to the
expected type, it will automatically be converted to this. If this is not possi-
ble, the result of this operation is given as invalid.

NOTE

Only the integral part is used for all parameters.

A variable of the type Date/Time cannot be transferred as a parameter
here.

Both for the automatic and explicit conversion of a Time to the type
Number, the number of days are counted since December 30, 1899
at 01 hours.

Attention: December 30, 1899 01 hour = 0.00000 days, this number
is rounded off to 5 decimal places, but a relational operation for exam-
ple is carried out with the exact value!

Return value
Date/Time in the format yyyy-mm-dd hh:mm:ss UTC ±xx

Advertising