Pcon-ca/cfa, Power con – IAI America PCON-CA User Manual

Page 103

Advertising
background image

Chapter 3 Operation

POWER CON

PCON-CA/CFA

95

(Note 1) Set the period taken from entering the position number to turning CSTR ON to 6ms or

longer. Because 6ms timer process on the PLC is also entered to the controller,

positioning at another position may occur. Take the PLC scan time into account.

(Note 2) The completion position No. output is set to 0 during movement of the actuator.

T1t6ms

(Note 1)

PM1 to PM**㧩0

(Note 2)

PM1 to PM**㧩0

(Note 2)

Operation of actuator

Not turned ON for

miss-pressing

Approach operation

Pressing

operation

Pressing

Completion

Positioning be setting

of coordinate Value

Movement by

positioning

width

Stop of

pressing

Command position No.

PC1 to PC**

(PLCĺController)

Completed position

PM1 to PM**

(ControllerĺPLC)

Start signal CSTR

(PLCĺController)

Positioning Completion Signal

PEND

(ControllerĺPLC)

Turned OFF by

turning PEND OFF

Moving Signal MOVE

(ControllerĺPLC)

Advertising