Pcon-ca/cfa, Power con – IAI America PCON-CA User Manual

Page 105

Advertising
background image

Chapter 3 Operation

POWER CON

PCON-CA/CFA

97

Judging completion of pressing operation

The operation monitors the torque (current limit value) in percent in “Pressing” of the position

table and turns pressing complete signal PEND ON when the load current satisfies the

condition shown below during pressing. PEND is turned ON at satisfaction of the condition if

the work is not stopped.

(Accumulated time in which current reaches pressing value [%])

– (accumulated time in which current is less than pressing value [%])

• 255 ms (Parameter No.6)

Current

Time

Pressing [%]

Operation

start

Approach end

Pressing start

200ms

20ms

75ms

295ms

200ms + 75ms – 20ms • 255ms

Pressing complete (PEND output)

Contactiong wark

Decrease in current due

to movement of work

Advertising