Priming and purging the ngc discover system, Priming ngc discover systems, Priming and purging the ngc – Bio-Rad ChromLab™ Software User Manual

Page 128: Discover system

Advertising
background image

3

| Preparing the Instrument

126

| NGC Chromatography Systems and ChromLab Software

Priming and Purging the NGC

Discover System

Priming the NGC Discover system is a manual procedure and involves priming the

buffer blending valve starting from the Q4 port to Q1 then the buffer inlet valve

starting from buffer inlet A1. Purging the NGC Discover system is an automated

procedure and involves removing air from one or all buffer lines as well as the buffer

inlet valves and the system and sample pumps. Both procedures require access to

ChromLab.

Tip:

You can perform the steps on the NGC touch screen.

On the NGC Discover system you prime and purge the following modules:

Buffer blending valve module

Buffer inlet valve modules

Sample pump module

Sample inlet module (NGC Discover Pro series)

Priming NGC Discover Systems

Note:

This section assumes that you have not introduced buffer into the lines.

If you have buffer in the lines and are purging the lines of small air bubbles,

proceed to

Purging the NGC Discover System on page

133

.

Important:

T

he instrument’s buffer lines cannot be primed when the system is

under pressure. If your system does not have a buffer blending valve, turn the

inject valve to Waste to release the system pressure before opening the priming

port.

To prime the buffer blending valve

1.

Immerse the inlet tubing for ports Q1–Q4 in their respective buffer containers.
(See

Plumbing the NGC Discover System on page

278

for more information.)

2.

On the ChromLab computer or the touch screen, start ChromLab in Manual
mode.

3.

Set the fluidic scheme to NGC Discover.

Advertising