Bio-Rad ChromLab™ Software User Manual

Page 156

Advertising
background image

A

| Maintaining the Instrument

154

| NGC Chromatography Systems and ChromLab Software

As Needed

Tubing and connectors

Replace all tubing and connectors.

Pressure monitors

Calibrate the monitors. Start ChromLab
software and select Tools > Calibrate.
Complete the calibration steps in the dialog
box.

pH electrode

Check the values for slope and offset. Start
ChromLab software and select Tools >
Calibrate and choose pH from the dropdown
list. Complete the calibration steps in the
dialog box. Replace the pH probe if
necessary.

Store in storage solution when not in use.
See Table

15 for recommended storage

solutions for the pH electrode.

Tip:

See

Storing the pH Electrode on

page

217

for information about storing

the electrode.

Wash housing check
valves

Replace the wash housing check valves.

Sample pump

Calibrate flow rate of the sample pump.

Sample pump seals and
check valve

Replace the seals and check valve using the
pump head maintenance kit.

System pump

Calibrate the flow rate.

System pump seals and
check valve

Replace the seals and check valve using the
pump head maintenance kit.

UV, UV/Vis, and
conductivity monitors

Check the reference and signal voltage.

Replace the light source if necessary.

Calibrate the conductivity monitor.

UV/Vis flow cell

Replace the flow cell if it is fouled and
cannot be cleaned.

Table 14.

NGC instrument maintenance schedule, continued

Interval

Component

Action

Advertising