Plumbing the ngc discover system, For mor, Plumbing the ngc – Bio-Rad ChromLab™ Software User Manual

Page 280: Discover system

Advertising
background image

C

| Plumbing the System

278

| NGC Chromatography Systems and ChromLab Software

Plumbing the NGC

Discover System

Table

22 lists the tasks for plumbing the NGC Discover™ system. The tasks are

explained in detail in the sections that follow.

Note:

Ensure that you complete the plumbing tasks in the section

Plumbing All

NGC Systems on page

265

before continuing.

The figure on page

279 shows the Point-to-Plumb connections for the

NGC

Discover system.

Table 22.

Plumbing tasks for the NGC Discover system

Tasks

1.

Inlet tubing to the left pump head wash port on the sample pump

2.

Pump head wash priming line

to the right pump head wash port on the

sample pump

3.

1/4-28 union to the

pump head wash priming line

on the sample pump

4.

Inlet tubing to the other end of the 1/4-28 union on the sample pump

5.

Inlet tubing to ports Q1–Q4 on the buffer blending valve

6.

Inlet tubing to the remaining ports on the buffer inlet valves

7.

Inlet tubing to the inlet manifold on the sample pump

8.

Waste tubing to the Cal Out port on the pH valve

9.

Priming line

to the calibration inlet port (Cal In) on the pH valve

10.

Tube #2 from the 40 psi backpressure regulator to the inlet of the pH
valve

11.

Tube #4 from the 40 psi backpressure regulator to the Common inlet port
on the BioFrac fraction collector diverter valve

Advertising