Plumbing the ngc scout system – Bio-Rad ChromLab™ Software User Manual

Page 276

Advertising
background image

C

| Plumbing the System

274

| NGC Chromatography Systems and ChromLab Software

Plumbing the NGC Scout System

Table

21 lists the tasks for plumbing the NGC Scout™ system. The tasks are

explained in detail in the sections that follow.

Note:

Ensure that you complete the plumbing tasks in the section

Plumbing All

NGC Systems on page

265

before continuing.

The figure on page

275 shows the Point-to-Plumb connections for the

NGC

Scout

system.

Table 21.

Plumbing tasks for the NGC Scout system

Tasks

1.

Inlet tubing to ports Q1–Q4 on the buffer blending valve

2.

Waste tubing to the calibration outlet port (Cal Out) on the pH valve

3.

Pump head wash priming line

to the calibration inlet port (Cal In) on pH

valve

4.

Tube #2 from the 40 psi backpressure regulator to the inlet port on the
pH valve

5.

Tube #4 from the outlet port on the pH valve to the Common inlet port on
the BioFrac fraction collector diverter valve

Advertising