Bio-Rad ChromLab™ Software User Manual

Page 167

Advertising
background image

System and Sample Pumps

Instrument Guide

| 165

To install the pump head check valve assemblies

1.

To determine the inlet and outlet pump head housing ports, place the two pump
head housings side by side with the flat sides touching.

2.

Insert an IN check valve assembly into the bottom port of each pump head
housing and hand tighten firmly.

3.

Turn the pump head upside down so that the IN check valve is on top.

Advertising