Prime the system. see, To plumb and prime the system pump wash lines on – Bio-Rad ChromLab™ Software User Manual

Page 269

Advertising
background image

Plumbing NGC Systems

Instrument Guide

| 267

To plumb and prime the system pump wash lines

1.

Mount a tube holder to the right or left side of the instrument in either the upper
or lower rack slots.

2.

Fill a 50 ml tube with 20% isopropanol (IPA) and insert it in the tube holder.

Tip:

You can use 20% ethanol as an alternative.

3.

Connect inlet tubing to the pump wash inlet port (left rear port) on
system

pump

A.

4.

Immerse the other end of the pump A wash inlet tubing in the tube of 20% IPA.

5.

Connect the pump head wash priming tubing to the outlet (right rear port) on
system pump B.

6.

Connect a 1/4-28 female to female luer adaptor to the pump head wash
priming tubing.

7.

Connect a 1/4-28 union to a second inlet tubing. You will use the inlet tubing as
the outlet tubing for system pump B.

Tip:

Set the inlet tubing with the attached union aside. Keep it close by, as

you will attach it to the pump head wash priming tubing on step 12.

Advertising