Prime the system. see, To plumb and prime the system pump wash lines on – Bio-Rad ChromLab™ Software User Manual
Page 269

Plumbing NGC Systems
Instrument Guide
| 267
To plumb and prime the system pump wash lines
1.
Mount a tube holder to the right or left side of the instrument in either the upper
or lower rack slots.
2.
Fill a 50 ml tube with 20% isopropanol (IPA) and insert it in the tube holder.
Tip:
You can use 20% ethanol as an alternative.
3.
Connect inlet tubing to the pump wash inlet port (left rear port) on
system
pump
A.
4.
Immerse the other end of the pump A wash inlet tubing in the tube of 20% IPA.
5.
Connect the pump head wash priming tubing to the outlet (right rear port) on
system pump B.
6.
Connect a 1/4-28 female to female luer adaptor to the pump head wash
priming tubing.
7.
Connect a 1/4-28 union to a second inlet tubing. You will use the inlet tubing as
the outlet tubing for system pump B.
Tip:
Set the inlet tubing with the attached union aside. Keep it close by, as
you will attach it to the pump head wash priming tubing on step 12.