Plumbing the NGC Quest System

Table

20 lists the tasks for plumbing the NGC Quest™ system. The tasks are

explained in detail in the sections that follow.

Note:

Ensure that you complete the plumbing tasks in the section

Plumbing All

NGC Systems on page

265

before continuing.

The figure on page

272 shows the Point-to-Plumb™ connections for the

NGC

Quest system.

Table 20.

Plumbing tasks for the NGC Quest system

Tasks

1.

Inlet tubing to the system pump A inlet manifold

2.

Inlet tubing to the system pump B inlet manifold

3.

Tube #4 from the 40 psi backpressure regulator to the Common inlet port
on the BioFrac™ fraction collector diverter valve