Preparing the detectors, Uv lamps – Bio-Rad ChromLab™ Software User Manual

Page 99

Advertising
background image

Preparing the Detectors

Instrument Guide

| 97

4.

Connect the tubing to the check valves.

Preparing the Detectors

The NGC systems ship with the conductivity monitor and the UV detectors installed,

calibrated, and ready for use. These modules require no preparation.

The pH module (if installed) requires you to install and calibrate the pH probe. See

the section

Replacing the pH Probe on page

218

for information about installing a

new pH probe.

UV Lamps

The UV detector ships with the UV lamps installed. When the instrument starts, the

lamps turn on.

Advertising