Plumbing the ngc discover pro system – Bio-Rad ChromLab™ Software User Manual

Page 285

Advertising
background image

Plumbing NGC Systems

Instrument Guide

| 283

Plumbing the NGC Discover Pro System

Table

23 lists the tasks for plumbing the NGC Discover Pro system. The tasks are

explained in detail in the sections that follow.

Note:

Ensure that you complete the plumbing tasks in the sections

Plumbing

All NGC Systems on page

265

and

Plumbing the NGC Discover System on

page

278

before continuing.

The figure on page

284 shows the Point-to-Plumb connections for the

NGC

Discover Pro system.

Table 23.

Plumbing tasks for the NGC Discovery Pro systems

Tasks

1.

Tube #6 between the outlet port on the sample inlet valve and the
inlet port on the sample pump

Note:

Remove the inlet tubing from the sample pump inlet

manifold if it is installed.

2.

Connect one of the following:

Tube #4 from the Common inlet port on the BioFrac fraction
collector diverter valve to port 1 on the outlet valve

Waste tubing to port 1 on the outlet valve

3.

Inlet tubing to the remaining ports on the sample inlet valve

See the section

Plumbing Sample Inlet Valves on page

285

.

4.

Outlet tubing to the remaining ports on the outlet valve

See the section

Plumbing Outlet Valves on page

286

.

Advertising