Bio-Rad ChromLab™ Software User Manual

Page 283

Advertising
background image

Plumbing NGC Systems

Instrument Guide

| 281

To plumb the buffer inlet valves

1.

Connect tubing from Outlet A on the buffer blending valve to port 8/BB on
buffer inlet valve A.

2.

Connect tubing from Outlet B on the buffer blending valve to port 8/BB on inlet
valve B.

3.

Connect tubing from the Out port on inlet valve A to the inlet manifold of system
pump

A.

4.

Connect tubing from the Out port on inlet valve B to the inlet manifold of
system pump

B.

5.

(Optional) Connect inlet tubing to ports 2–7 on both buffer inlet valves A and B.

To plumb the sample pump

1.

Connect inlet tubing to the sample pump inlet manifold.

2.

Immerse the other end of the inlet tubing in a bottle of degassed, deionized
water.

3.

Connect outlet tubing to the Sample Pump port on the sample inject valve.

Advertising