Etup, Nstallation and, Ower – Doremi ShowVault / IMB User Manual

Page 242: Equence, 2 hfr setup, 3 non-hfr setup, 4 installation and power-up sequence

Advertising
background image

____________________________________________________________________________________

SHV.OM.001663.DRM

Page 242 of 276

Version 1.7

Doremi Labs

22.2 HFR Setup

For HFR setups, the user must be running software version 2.6.3 or higher.
Primary IMB (SM):

Firmware: 32.07d or higher.

Alternative Firmware: 32.06z or higher.

Security Manager: 5.1.4 or higher.

Secondary IMB (LD):

Firmware: 33.05k or higher.

Alternative Firmware: 33.07a or higher.

Security Manager: 5.1.4 or higher.

22.3 Non-HFR Setup

For non-HFR setups, the user must be running software version 2.6.3 or higher.
Primary IMB (SM):

Firmware: 32.07d or higher.

Security Manager: 5.1.4 or higher.

Secondary IMB (LD):

Firmware: 33.05k or higher.

Security Manager: 5.1.4 or higher.

22.4 Installation and Power-Up Sequence

Installation:

Verify that both projectors and the ShowVault are turned off.

Install the IMB-SM in the primary projector.

Install the IMB-LD in the secondary projector.

Connect Ethernet cables to both projectors and the ShowVault and verify that they are

on the same network.

Connect the PCI-express cable from the ShowVault to the IMB-SM (primary projector).

Connect BNC cables (A and B) fr

om the Primary Projector’s SDI-out connectors to the

Secondary Projector’s SDI-In connectors (Figure 319).

Advertising
This manual is related to the following products: