13 glp manager – Metrohm 915 KF Ti-Touch User Manual

Page 135

Advertising
background image

■■■■■■■■■■■■■■■■■■■■■■

13 GLP manager

915 KF Ti-Touch

■■■■■■■■

121

13 GLP manager

Main dialog: System

GLP manager

In the GLP manager you can document data for various GLP tests. The
results of the automatic system tests carried out after switching on are
also documented.

The following tests can be documented:

GLP test "Measurement" (see Chapter 13.3, page 123)

GLP test "Titration" (see Chapter 13.3, page 123)

System validation (see Chapter 13.4, page 127)

In addition, you can also:

Create a list with your test tools (see Chapter 13.2, page 122).

Define a service interval for having routine maintenance carried out by
a Metrohm service technician (see Chapter 13.5, page 131).

Define an interval for the regular performance of backups (see Chapter
13.5, page 131)
.

Further information about quality management and validation is also given
in the documentation series Quality Management with Metrohm and
Application Bulletin AB 255 (Validation of Metrohm Karl Fischer titra-
tors in accordance with GLP/ISO 9001).

The table shows the last time that each test was carried out and when the
next test is to be carried out. A test is entered in the list the first time that
it is documented.

[Test tools]

Configure test tools for GLP tests (see Chapter 13.2, page 122).

Advertising