3-2

Axxius 800 - Release 2.2

Electrical Installation and Cabling

Compliant Installation

Compliant Installation

WARNING!

A

LL

TELECOMMUNICATION

NETWORK

CONNECTIONS

MUST

USE

MINIMUM

26 AWG

WIRE

.

1. Mount unit in an area that meets Environment conditions, see Installation

Environment on page 2-3.

2. Unit should have power supply(s), controller(s) and Interface cards installed

before power up.

NOTE:

All cards (power supplies, controllers, interface, relay and service)

slide into the unit in the same manner. There are guides for each slot (top
and bottom), which the card follows until it is firmly seated into the
backplane.

3. Ground the system, secure the ground lugs to the terminals using the nuts

provided. Attach #6 or #8 AWG copper wire to the terminal.

4. Install service cards.

5. Install blank faceplates in any slot that is not occupied.

6. Connect BITS Clock 1 and/or 2

7. Connect Alarming

8. Secure the power cable and the ground cable with a plastic tie (not included).

Keep these cables separate from the signal cables.

9. Terminate each signal cable to its appropriate connector.

10. Secure the signal cables using the small holes along the bottom of the rack and

plastic ties (not included).

11. Plug in power, to the system, apply the appropriate power for the installed

Power Supply(s)