Festo Электромотор MTR-DCI User Manual

Page 103

Advertising
background image

5. Commissioning

5-25

Festo P.BE-MTR-DCI-IO-EN en 1209d

If there is a 1-signal at the ENABLE input, the controller and
the power end stage will be switched on. The current position
set will be processed at the next START signal.

Pin

Status

ENABLE

I6

1-signal

Controller and power end stage are
switched on

0-signal

Controller and power end stage are
switched off

1

> 0

Quit faults

READY O1

Ready to operate. All prerequisites for starting a positioning
procedure are fulfilled.

Pin

Level

READY

O1

0

System is not ready to operate.
– ENABLE is not set

or

– there is a fault

1

System is ready to operate.
– ENABLE is set

and

– no fault

MC O2

Motion complete
Shows that a positioning order has been completed and that
the START input has been reset.

Pin

Status

MOTION COMPLETE

O2

0-signal

Positioning procedure is being carried out or
there is still a START signal at 1.

1-signal

Positioning task is completed

Advertising