Commissioning 5-30 – Festo Электромотор MTR-DCI User Manual

Page 108

Advertising
background image

5. Commissioning

5-30

Festo P.BE-MTR-DCI-IO-EN en 1209d

Note
If a fault occurs during operation, you must do the
following before starting a new position set:

– if necessary, reset the START input (= 0).

– delete the fault with a falling edge at ENABLE (

> 0),

When the fault has been eliminated and there is a rising edge
at ENABLE (

> 1) the READY output signalizes (> 1) that a

new positioning task can be started. If the fault cannot be
eliminated, this may be caused by a cable fracture.

1

0

1

0

(TR)

READY

O1

1

0

1

0

START

I5

1

0

(FAULT)

Drive in motion

Start 1

1

0

Position set
I1...I4

1

0

MC

O2

ENABLE

I6

Nominal position
reached

Ready for
operation

t

TR

t

t

TR

Start 2

Nominal position
reached

t ‹ t

TR

Cancel

Enable

Fig. 5/3:

Pulse-time diagram (positioning procedure – start – nominal position reached –
cancel)

Advertising